GUIDE TO THE CALCULATION
Methodology, worked examples and limitations
Methodology for comparable tender evaluation
Use the tender comparison tool to evaluate supplier, service or works proposals on a consistent basis. First define the evaluation currency, bid scope, mandatory eligibility requirements and applicable criteria. Then enter the bidders’ submitted figures and any adjustments needed for a like-for-like comparison. Differences in scope, quantities, technical compliance, payment terms, warranty and delivery assumptions should be identified before comparing prices. A low nominal tender price is not necessarily the lowest evaluated cost.
Price normalization and scoring
For a criterion where a lower positive value is better, the tool uses a cost-ratio score: lowest comparable positive bid / bidder’s comparable bid × 100. Thus the lowest compliant offer receives 100%; more expensive offers receive progressively lower scores. If three comparable offers are USD 1,000,000, USD 1,200,000 and USD 1,500,000, their price scores are 100%, 83.33% and 66.67%, respectively. The price premium is a different statistic: those offers are 0%, 20% and 50% above the lowest price. A price premium over 100% is possible, but a normalized price score should not exceed 100%.
If price has a weighting of 40% in the evaluation, the corresponding weighted price contributions are 40.00, 33.33 and 26.67 points, before applying the other criteria. Technical or qualitative criteria assessed with a direct rubric must be scored from 0 to 100. For a benefit-ratio criterion, a higher measured value is better. No criterion weighting should be changed after viewing bids without a documented and authorized evaluation-methodology decision.
Commercial normalization and evidence
Identify recoverable and non-recoverable tax treatment, agreed exchange rates, arithmetic corrections, evaluated exclusions, unconditional discounts and any cost loadings specified in the tender rules. Check the same quantities and currency basis for all offers. Where the tool reports incomplete common data, its weighted score is indicative: it does not mean that missing evidence has received zero or that the original complete evaluation criteria have been satisfied. Mandatory failed items should be considered separately from price ranking.
Keep the original bids, clarification records, tender correspondence, scoring evidence and approval record with the evaluation report. The tool supports comparison and audit preparation; it does not replace the procuring entity’s tender procedures, contractual evaluation rules or professional judgment. For initial project cost allowances rather than bid comparison, use the Project Budget Calculator.
